 |
Mohave
County District Library
This
project included developing a scope of work and designing a new library
of 15,500 square feet, carried through to final completion. This
building included an Entry Area, which includes the following: an
entrance and vestibule, restrooms, storage, multi-purpose room and book
drop.
|
 |
Lake
Havasu City Fire Station No. 1
This
project included developing a scope of work and designing a new 10,270
square-foot fire station for the Lake Havasu City Fire Department at a
total construction cost of $927,800 (within budget).
|
 |
Sunrise Elementary School
The school addition consists of 15,758 sq. ft. of classroom buildings and support systems, as well as related site work. Master planned as the second phase, the integration of the new construction with the existing buildings is the owner’s top priority.
|
 |
Riverside
Daycare Facility
At
a projected cost of $1.2 million, this specially-designed 24-hour
Daycare center will hold approximately 180 children at any one time and
consist of approximately 9,000 square feet of interior space and 5,000
square feet of exterior area.
|
 |
University
of Alaska
This
agricultural research laboratory, used for the scholastic study of
plants, animals, and soils, was designed to expand over time to join an
existing facility to the north. This 14,000 square foot building,
located in Palmer, Alaska, features an assortment of innovative design
features.
|
 |
Kingman
Fire Station No. 3
This project included developing a scope
of work and designing a new 4,900 square foot fire station for the
Kingman Fire Department with a total construction cost of approximately
$400,000.
|
 |
Community
Lutheran Church
Community
Lutheran Church was designed with two main wings—the 2,000 square foot
sanctuary, and 3,000 square feet of office space and classrooms—joined
at an angle, with a 1,000 square foot narthex between them. The
construction cost was approximately $750,000, and the project was
completed on time and within budget.
|
 |
Glacierview
School
This
6,000 square foot building was the first phase
of a K-8 school, and was master-planned into a larger 24,000 square foot
facility. The design, completed in response to the oil embargo of the
late 70’s, features an energy-conserving earth shelter. The project
was completed on time and within budget.
|
 |
East
Elementary School
This
K-6 school remodel and addition consists of 36,000 square feet of
classrooms, administration space, a gymnasium, media center, mechanical
room, restrooms, and storage areas. Ideologically, the design philosophy
reflects fundamental teaching methods, with individual classrooms for
each school grade. To the rear of the building is sited an outdoor
fitness trail. This trail includes 14 exercise stations, i.e., a
tire-trot, 3-way chin-up bar, etc.
|
 |
Willow
Elementary School
This
rural K-6 school consists of 30,000 square feet of classrooms,
administration space, a gymnasium, media center, mechanical room,
restrooms, and storage areas.
|
 |
Judicial
Facilities
This
new judicial building was designed for future expansion and features
8,000 square feet of space. The construction cost was approximately
$600,000.
|